Misplaced Pages

Rye railway station (East Sussex)

Article snapshot taken from[REDACTED] with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.

Railway station in East Sussex, England

Rye[REDACTED]
Front view of the main building
General information
LocationRye, Rother
England
Grid referenceTQ918205
Managed bySouthern
Platforms2
Other information
Station codeRYE
ClassificationDfT category E
History
Opened13 February 1851
Passengers
2019/20Decrease 0.474 million
2020/21Decrease 0.153 million
2021/22Increase 0.399 million
2022/23Increase 0.431 million
2023/24Increase 0.459 million
Listed Building – Grade II
FeatureRailway station
Designated11 April 1980
Reference no.1252164
Notes
Passenger statistics from the Office of Rail and Road
Marshlink line
Legend
High Speed 1
to St Pancras International
South Eastern Main Line
to Charing Cross & Cannon Street
Maidstone line
to Swanley
Ashford International Eurostar
56 mi 12 ch
90.36 km
Ashford to Ramsgate line
to Canterbury West
Ashford Steam Centre Ashford Steam Centre
High Speed 1
to Channel Tunnel
South Eastern Main Line
to Dover Priory
Newtown Sidings
A2070
Park Farm (proposed)
Ham Street
61 mi 51 ch
99.2 km
A2070
Royal Military Canal
62 mi 77 ch
101.33 km
Appledore
64 mi 50 ch
104 km
Brookland Halt
A259
Brookland Level
Crossing (AOCL)
67 mi 20 ch
108.23 km
Lydd Town
71 mi 55 ch
115.37 km
New Romney and Littlestone-on-Sea
Original alignment
directly to New Romney
Greatstone-on-Sea Halt
Lydd-on-Sea Halt
Dungeness Nuclear Fuel Transfer
Lydd Camp
Dungeness
A259
Star Level
Crossing (AHBC)
69 mi 40 ch
111.85 km
A259
East Guldeford Level
Crossing (AHBC)
70 mi 19 ch
113.04 km
River Rother
71 mi 15 ch
114.57 km
Rye
71 mi 36 ch
114.99 km
River Tillingham
Rye Harbour
Winchelsea
73 mi 22 ch
117.92 km
River Brede
Snailham Halt
Doleham
77 mi 43 ch
124.78 km
Three Oaks
78 mi 65 ch
126.84 km
Ore Tunnel (
1042 yd
953 m
)
Ore Carriage Sidings
Ore
81 mi 42 ch
131.2 km
Mount Pleasant Tunnel (
230 yd
210 m
)
Park Sidings
82 mi 8 ch
132.13 km
Hastings
82 mi 33 ch
132.63 km
East Coastway line
to Eastbourne
&
Hastings line
to Tonbridge
Mileage from Charing Cross via South Eastern Main Line

Rye railway station is a Grade II listed station, serving Rye, East Sussex, England. It is on the Marshlink line between Hastings and Ashford International and is the principal station between those two terminals. The station is a passing place between two single-track sections. Services are provided by Southern, usually between Eastbourne and Ashford.

A station at Rye was first planned in the early 1840s, though on a different route to what was opened. It was built by the South Eastern Railway as the central station on the line from Hastings to Ashford, opening in 1851. Despite recommendation for closure in the 1963 Beeching Report, it has remained open because of poor quality road connections. The station building was designed by William Tress; it was Grade II listed in 1980, while an 1894 signal box was listed in 2013.

Location

The station is on Cinque Ports Street to the north of the town centre, between two level crossings to the west and east. There are two platforms, one for trains to Ashford and the other for Hastings. The line is double track through the station providing a passing loop for trains on the Marshlink line, which is single-track between Ore and Appledore. The staggered platforms are linked by a footbridge. There is a waiting room on Platform 2 (Hastings bound).

Stagecoach South East bus routes 70, 100, 101, 102, 292, 293, 312, 313, 326, 342 and 553 serve the station.

History

Background

A Southern Class 171 train at Platform 2
View of Platform 1 (Ashford-bound) from the footbridge

A station at Rye was proposed in April 1840, when the Tenterden, Rye & Hastings Branch Railway planned a line from the South Eastern Main Line near Smarden to Hastings via Tenterden and Rye. At the time, harbour duties were not charged at Rye, making it a suitable port for goods traffic. The following year, it was estimated that a single-track line from the South Eastern Main Line to Hastings via Rye could be built for £250,000 (£28,715,000 in 2023). The company attempted to negotiate construction with the South Eastern Railway (SER), who thought the route was a poor choice and preferred to reach Hastings from Tunbridge Wells via Penshurst.

In 1844, the SER became concerned that the Brighton, Lewes & Hastings Railway (BLHR) would extend its line beyond Hastings to Rye and Ashford. A compromise was reached whereby the BLHR was granted permission to build the line with an option for the SER to take over if necessary. The River Rother to the east of Rye was still navigable and required a moveable crossing. Peter W. Barlow designed a swing-bridge to carry the line over the river. Both this bridge and the one over the River Tillingham to the west required approach ramps on an otherwise flat stretch of railway.

The SER's contract stipulated that the company should contribute £10,000 (£1,154,000 as of 2023) towards improving Rye Harbour, and Robert Stephenson recommended a branch line for goods traffic. This was constructed west of the station and the River Tillingham, running to the harbour pier on the opposite side of the river to the town. The branch line never carried passengers and has been demolished.

Opening

The first train to Rye ran on 28 October 1850, before the line had been fully completed. The Mayor of London travelled from London Bridge to Rye via Ashford and gave a short speech at the station. It opened on 13 February 1851, along with stations at Ham Street, Appledore and Winchelsea. A coal stage opened in 1854, and new goods sidings were added in 1874.

In 1859, a proposal was made to link Rye with Folkestone via Lydd and Dymchurch. The SER declined to finance the line. In 1864, the Weald of Kent Railway proposed building a line from Paddock Wood to Appledore (and hence to Rye) via Tenterden. The scheme was cancelled two years later.

Post-opening

Marshlink trains are scheduled to pass at Rye

The swing bridge to the east of the station over the River Rother was replaced by a fixed bridge in 1903. A footbridge was installed across the staggered platforms at the station in 1960, in preparation for the Kent electrification scheme Phase 2 of the British Railways Modernisation Plan, which provisionally included the line through Rye.

The line was recommended to be closed in the 1963 Beeching Report, but because of poor road connections, it remained open along with its stations. The prolonged threat of closure left the station unmodernised and gaslit well into the 1970s. On 1 October 1979, the Marshlink line either side of Rye was reduced to a single track, leaving a passing loop at the station. Though done for economic reasons, it created bottlenecks, and invited criticism.

The station was Grade II listed in April 1980 owing to its "special architectural or historic interest". The goods shed, which was closed in 1963, was demolished in 1984.

In November 2023, the station was closed for safety reasons while a bonfire event in the town took place.

Buildings

The station's signal box, opposite Platform 2

Construction of the station building began in 1847. It was designed by William Tress in symmetric Italianate style of two storeys with an attic in red brick with a slate roof and set of gateless gate pillars. As Rye was planned to be a more significant stop than Appledore or Winchelsea, it was designed to be bigger than those. Tress also designed a goods shed in a similar style, sited alongside the main station building.

Several SER stations were retrofitted with signals on the line in the early 1890s. The box at Rye was built in 1894 using a Saxby & Farmer Type 12 design. It retains its original 1888 pattern Duplex frame, though the original 30-lever manual signals were replaced by coloured lights on 1 October 1979. The ground floor is constructed of Flemish bond brown brick, the first floor is made of timber with weatherboard cladding, and the building is covered by a slate roof. The signal box was Grade II listed in 2013 as it is one of only two of its type still standing in good condition. In 2019, it was repainted and refurbished.

Services

Class 171 Turbostar Diesel Multiple Unit number 171729 on a Brighton service
A Southern Class 171 service on Platform 1, bound for Ashford International

All services at Rye are operated by Southern using Class 171 diesel multiple units.

The typical off-peak service in trains per hour is:

Late at night, services only run to Ashford and Hastings.

Previously, westbound trains ran as an express service to Brighton although this was changed to a stopping service to Eastbourne in the May 2018 timetable change.

Until 2020, shuttle trains ran between Rye and Ashford during peak hours. These were withdrawn as part of the COVID-19 pandemic restrictions, but briefly reappeared in June 2023. As of late 2023, there are no peak shuttle services.

There have been several proposals to integrate the Marshlink line with High Speed 1 at Ashford, which would allow a direct connection between Rye and St Pancras, with estimated times of less than an hour (down from 85 minutes). In 2018, Network Rail announced a fast service from St Pancras to Hastings would stop at Rye, and could be implemented by 2024. However, the date remains uncertain despite support from Amber Rudd, a former Member of Parliament for Hastings and Rye.

Preceding station [REDACTED] National Rail Following station
WinchelseaSouthernMarshlink LineAppledore

References

Citations

  1. ^ Historic England (11 April 1980). "Rye Railway Station (1252164)". National Heritage List for England. Retrieved 4 October 2019.
  2. "Survey of the St. Leonards and Hastings to Ashford Line by the Government Inspector". Sussex Advertiser. England. 31 December 1850. Retrieved 24 July 2024 – via British Newspaper Archive.
  3. ^ Course 1974, p. 68.
  4. "Station facilities for Rye (Sussex)". National Rail. Retrieved 4 October 2019.
  5. "Rye". bustimes.org. Retrieved 4 October 2019.
  6. Gray 1990, pp. 192–193.
  7. ^ Gray 1990, pp. 208–209.
  8. Gray 1990, p. 206.
  9. Course 1974, p. 69.
  10. Course 1974, p. 66.
  11. Gray 1990, pp. 210–211.
  12. Gray 1990, p. 212.
  13. Gray 1990, p. 227.
  14. Gray 1990, pp. 223–224.
  15. Mitchell & Smith 1987, 50.
  16. Sissons 2008, p. 408.
  17. Toynbee, Mark. "A Brief History of the Marshlink line". Marshlink Action Group. Retrieved 7 October 2019.
  18. Mitchell & Smith 1987, 42.
  19. "Rye Bonfire: Train station closure for popular bonfire event". BBC News. 22 October 2023. Retrieved 19 January 2024.
  20. Mitchell & Smith 1987, 52.
  21. ^ Historic England (18 July 2013). "Rye Signal Box (1415163)". National Heritage List for England. Retrieved 4 October 2019.
  22. Mitchell & Smith 1987, 49.
  23. "Signal box gets makeover". Rye News. 1 August 2019. Retrieved 7 October 2019.
  24. Law, John (2021). London's Railways Since the 1970s. Amberley. p. 157. ISBN 9781445695747.
  25. ^ "Table U". Southern. 11 December 2023. Retrieved 19 January 2024.
  26. "Plans to axe unpopular two-carriage Eastbourne train service". Eastbourne Herald. 4 July 2017. Retrieved 30 May 2019.
  27. "Lewes 'losing out' under new rail timetable". Sussex Express. 16 May 2018. Retrieved 30 May 2019.
  28. "Shuttle returns – for the day". Rye News. 1 June 2023. Retrieved 19 January 2024.
  29. "All aboard the High Speed?". Rye News. 15 June 2017. Retrieved 7 October 2019.
  30. ^ "Date for implementation of high-speed trains in 1066 Country remains 'unknown'". Hastings Observer. 20 September 2018. Retrieved 8 October 2019.
  31. "Plan for high-speed trains from Ashford to Hastings". Kent Online. 31 May 2018. Retrieved 7 October 2019.

Sources

  • Course, Edwin (1974). The Railways of Southern England : Secondary and branch lines. Batsford. ISBN 0-7134-2835-X.
  • Gray, Adrian (1990). South Eastern Railway. Middleton Press. ISBN 978-0-906520-85-7.
  • Mitchell, Vic; Smith, Keith (1987). South Coast Railways - Hastings to Ashford and the New Romney Branch. Middleton Press. ISBN 0-906520-37-1.
  • Sissons, Rob (2008). Single track obsession : a book of extraordinary railway journeys. Victoria, BC: Trafford. ISBN 978-1-4251-6239-9.

External links

50°57′08″N 0°43′50″E / 50.952340°N 0.730690°E / 50.952340; 0.730690

Railway stations in East Sussex
Bedford and London to Brighton
London to Eastbourne
London to Hastings
Brighton to Hastings:
East Coastway
Hastings to Ashford:
Marshlink
Brighton to Seaford
Southampton to Brighton:
West Coastway
London to Uckfield
Heritage railway stations
Bluebell Railway
Kent and East Sussex Railway
Lavender Line
Spa Valley Railway
Stations in italics are proposed heritage railway stations.
Thameslink, Great Northern, Southern and Southeastern routes
Southern routes serving this station
Coastway East
Stations in italics are served on limited occasions, at peak hours or on Sundays only.
Categories:
Rye railway station (East Sussex) Add topic