Misplaced Pages

Mount Pleasant station (SkyTrain)

Article snapshot taken from[REDACTED] with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Metro Vancouver SkyTrain station
Mount Pleasant
SkyTrain station
Mount Pleasant station site in September 2022
General information
LocationVancouver
Coordinates49°15′46″N 123°06′02″W / 49.262657°N 123.100607°W / 49.262657; -123.100607
Owned byTransLink
PlatformsCentre platform
Tracks2
Construction
Structure typeSubway
AccessibleYes
Other information
StatusPlanned
Fare zone1
History
Opening2027 (2 years' time) (2027)
Services
Preceding station TransLink Following station
Broadway–City Halltowards Arbutus Millennium Line Broadway extension(opens 2027) Great Northern Way–Emily Carrtowards Lafarge Lake–Douglas

Mount Pleasant is a planned underground station for the Millennium Line of Metro Vancouver's SkyTrain rapid transit system. It will be located at the southwest corner of the intersection of East Broadway and Main Street in the Mount Pleasant neighbourhood of Vancouver, British Columbia, Canada. Originally scheduled to open in 2025, the station's projected opening has been pushed back twice; as of May 2024, it is scheduled to open in late 2027.

References

  1. Chan, Kenneth (March 22, 2018). "These are the 6 stations of the Broadway Subway in Vancouver (VISUALS)". Daily Hive. Archived from the original on March 24, 2018. Retrieved July 7, 2019.
  2. Chan, Kenneth (July 3, 2019). "These are the proposed station names for SkyTrain's Broadway Extension". Daily Hive. Archived from the original on July 4, 2019. Retrieved July 7, 2019.
  3. Chan, Kenneth (March 16, 2018). "It's official: Broadway Subway and Surrey LRT will be built in $7-billion transit plan". Daily Hive. Archived from the original on March 17, 2018. Retrieved July 7, 2019.
  4. Chan, Kenneth (March 4, 2021). "A new look at the station layouts of the Broadway Subway". Daily Hive. Archived from the original on March 5, 2021. Retrieved October 5, 2022.
  5. Chan, Kenneth (November 24, 2022). "Broadway Subway opening delayed to 2026". Daily Hive Vancouver. Archived from the original on November 25, 2022. Retrieved November 25, 2022.
  6. Chan, Kenneth (May 24, 2024). "Broadway Subway opening further delayed until Fall 2027". Daily Hive Vancouver. Archived from the original on May 24, 2024. Retrieved May 28, 2024.

External links

TransLink services in Metro Vancouver
SkyTrain
History – Lines and stationsRolling stock
Expo Line  
Lougheed branch
Surrey–Langley extension (future)
Millennium Line  
Broadway extension (future)
Canada Line  
Airport branch
Passenger ferry and commuter rail
SeaBus  
West Coast Express  
Bus routes and transit exchanges
B-Line  
RapidBus  
Exchanges
General
Former
B-Line
Exchanges
Miscellaneous
Cycling
Fares
Other
  • Stations ordered inbound → outbound
  • indicate connections
  • Future stations or routes italicized


Stub icon

This article about a railway station in British Columbia is a stub. You can help Misplaced Pages by expanding it.

This Vancouver-related article is a stub. You can help Misplaced Pages by expanding it.

Categories:
Mount Pleasant station (SkyTrain) Add topic