Misplaced Pages

Mirpur 10 metro station

Article snapshot taken from[REDACTED] with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Metro station in Dhaka
Mirpur 10
মিরপুর ১০
Dhaka Metro Rail station
General information
Other namesStation 6
LocationSection 10, Mirpur, Dhaka
Bangladesh
Coordinates23°48′30″N 90°22′06″E / 23.8084°N 90.3682°E / 23.8084; 90.3682
Owned byDhaka Mass Transit Company Limited
Line(s) MRT Line 5N 
 MRT Line 6 
PlatformsSide platform
Tracks2
Construction
Structure typeElevated
Platform levels3
ParkingNo
Bicycle facilitiesNo
AccessibleYes Disabled access
History
Opened1 March 2023 (2023-03-01)
Electrified1,500 V DC overhead catenary
Services
Preceding station Dhaka Metro Following station
Mirpur 1towards Hemayetpur MRT Line 5N Mirpur 14towards Bhatara
Mirpur 11towards Uttara North MRT Line 6 Kaziparatowards Kamalapur
Route map
Legend
km
Narayanganj–Bahadurabad
Ghat line
Tongi–Bhairab–Akhaura line
0.00 Tongi  BR 
Tongi Bazar
Turag River
Sonargaon Janapath East
Sonargaon Janapath West
Diabari Bazar
Tongi extension
(planned)
Diabari Depot
7.50 Uttara North Bus interchange
Uttara Center
Uttara South
Pallabi
Mirpur 11
Mirpur 10 5N
Kazipara
Shewrapara
19.23 Agargaon Bus interchange
Bijoy Sarani
Farmgate
Karwan Bazar 5S
Shahbag
Dhaka University
Bangladesh Secretariat
Motijheel Bus interchange 2
28.76 Kamalapur  BR 
Line 2
Line 1
Line 4
Dhaka–Jessore line
Narayanganj–Bahadurabad
Ghat line
Source
This diagram:
Location

Mirpur 10 (Bengali: মিরপুর ১০, romanised: Mirpur dosh) is an elevated metro station of the Dhaka Metro's MRT Line 6. This station is located next to Fire Service in Mirpur 10, a neighbourhood of Dhaka, Bangladesh. The station was opened on 1 March 2023.

During the July 2024 Revolution, the station's ticket vending machines and the signalling control section were destroyed in clashes.

Structure

Station layout

G Path level Exit / Entry
L1 Between Rent control, station agent, metro card vending machine, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 1
Southbound
Towards → Agargaon next station is Kazipara
Platform 2
Northbound
Towards ← Uttara North next station is Mirpur 11
Side platform | Doors will open on the left Disabled access
L2

References

  1. "Line 6 route map" (PDF). Dhaka Mass Transit Company Limited. Retrieved 23 December 2022.
  2. "প্রধানমন্ত্রীকে নিয়ে মাত্র ১০ মিনিটে দিয়াবাড়ি থেকে আগারগাঁওয়ে মেট্রোরেল". Prothom Alo (in Bengali). 28 December 2022. Retrieved 28 December 2022.
  3. Tuhin Shubhra Adhikary (6 June 2021). "Uttara-Agargaon Metro Rail: Launch now aimed at Dec 2022". The Daily Star. Archived from the original on 17 July 2021. Retrieved 14 September 2022.
  4. "মেট্রোরেলের পঞ্চম স্টেশনের দরজা খুলছে আজ". Prothom Alo (in Bengali). 1 March 2023. Retrieved 1 March 2023.
  5. "Scorn as Bangladesh PM weeps at train station damage". BBC. 26 July 2024. Retrieved 26 July 2024.
Line 6
Stations
Depot
Diabari Depot
Dhaka Metro
Lines
Others
Management
Dhaka Mass Transit Company Limited
Categories:
Mirpur 10 metro station Add topic