Line 8 of the Chengdu Metro (Chinese: 成都地铁8号线; pinyin: Chéngdū Dìtiě Bā Hào Xiàn) is a line on the metro network in Chengdu, Sichuan, China. The first phase opened on 18 December 2020.
The line runs from north-east to south-west and avoids the centre of Chengdu.
History
On 11 July 2016, NDRC approved the 3rd phase expansion for the Chengdu Metro, consisting of Line 6 phase 2 and 3, Line 8 Phase 1, Line 9, Line 10 Phase 2, Line 17 Phase 1, and Line 18. The third phase was to be simultaneously built with the already under construction second phase.
On 11 April 2020, Chengdu Metro reported that track-laying for Line 8 was completed.
On 8 August 2020, Line 8 's whole line power network passed quality assessment.
On 18 Dec 2020, Line 8 Phase 1 opened along with: Line 6 Phase 1/2/3, Line 9 Phase 1, Line 17 Phase 1, Line 18 Phase 2, marking the completion of all Phase 2 and 3 projects.
On 18 May 2020, Line 8 Phase 2, Line 27 Phase 1, Line 30 Phase 1 started construction. This marks the date all 4th Phase projects started construction.
On 27 March 2023, Line 8 Phase 2 finished Longgang~Lianhua section tunnel work. Line 8 Phase 2 entered railroad construction, electrics, and refurbishment stage.
On 19 December 2024, Line 8 Phase 2 opened for service.