Article snapshot taken from[REDACTED] with creative commons attribution-sharealike license.
Give it a read and then ask your questions in the chat.
We can research this topic together.
Line 2 of the Zhengzhou Metro (Chinese: 郑州地铁二号线; pinyin: Zhèngzhōu Dìtiě Èr Hào Xiàn) is a rapid transit line running from north to south of Zhengzhou. It opened on 19 August 2016. The line is currently 30.9 km long with 22 stations.
Through services are operated on Line 2 and Chengjiao line (part of future Line 9), although they are classified as separate lines.
History
The first phase of the line began construction on 28 December 2010, and began operations on 19 August 2016. The second phase of the line began operations on 28 December 2019.